摘 要
本次设计完成了大沱湾水电站拦河闸坝设计。设计重点包括大沱湾水电站首部闸坝枢纽平面布置、泄洪闸和冲砂闸结构设计。首先进行整个大沱湾水电站首部闸坝枢纽和相关建筑物的等别划分。其次参照工程地质条件和地形地貌等因素,并依据《水闸设计规范》进行首部闸坝枢纽的平面布置 。最后,进行泄洪闸和冲砂闸结构设计;主要内容包括闸室结构布置、闸室抗滑稳定验算、闸室地基应力计算、闸室底板配筋计算、消能防冲计算等。本次设计需要熟练运用所学的相关专业知识,通过查找收集所需设计参数和资料,并在老师的指导下独立完成全部设计内容。
关键词:大沱湾水电站;首部闸坝;闸室稳定;底板配筋
Abstract
This design has completed the design of the first gate dam hydropower station in the estuary. The design focuses on the design of the first dam station layout, Xie Hongzha and discharge structure of the river hydropower. Firstly, the Qiang River hydropower station first sluice dam project and related building classification. Secondly, according to the engineering geological conditions and topography and other factors, and on the basis of "design specification" sluice layout first sluice dam project are. Finally, to release flood waters gate and discharge structure design; main contents include chamber structure layout, the anti sliding stability calculation, the ground stress calculation, lock floor reinforcement calculation, the energy dissipation calculation etc.. The design requires skilled use of relevant expertise learned by looking to collect the required design parameters and data, and under the guidance of teachers to complete all design elements independently.
Key words: Qianghekou Hydropower Station; Department head dam; Chamber stability; Bottom reinforcement