摘 要
本设计是编制某基建项目工程投标文件,具体目标是根据工程量清单计算规则计算工程量,并进行适当的投标报价;应用完整的施工工艺和技术进行施工组织设计;熟悉投标文件的组成,以及编制相关文件。[1]
本文工程量计算书采用工程量清单计算规则,并标明相应计算规则计算。投标报价考虑了具体实际的相关技术措施和指标,单价分析中管理费以直接费的8%为主,部分以直接费的4%报价,利润则以直接费的7%计价为主,部分考虑实际能力,以直接费的5%计算。技术部分则是施工组织设计,采用了较成熟的施工技术和施工经验,工期紧凑合理,劳动力安排适当。
本文包括下列内容:
1.投标文件投标函部分,包括: 法定代表人身份证明书;投标文件签署授权委托书;投标函;投标函附录;投标担保银行保函;投标担保书,投标文件要求投标人提交的其他投标资料。
2.投标文件商务部分,包括:投标报价说明;投标报价汇总表;主要材料清单报价表;设备清单报价表;工程量清单报价表;措施项目报价表;其他项目报价表;工程量清单项目价格计算表;投标报价需要的其他资料
3.投标文件技术部分,主要是施工组织设计和项目管理机构配备情况
4.投标文件附图部分,包括附图1和附图2
5.工程量计算书部分
关键词:投标;工程量;工程量清单报价;报价;施工方案
Abstract
This design is to draw up tender documents of C engineering, the specific goals is according to bill of quantity calculation rule calculating engineering quantity, and carry on adequacy tender quotations; Applying the mature construction craft and technique carry on the construction organization design; Acquainting with the tender documents constitute, and drawing up relevant documents.
The engineering quantity calculation works adopt bill of quantity calculation rule, and note the relevant calculation rule in this text. Because tender quotations consider the actual and concrete related technique measure and index sign, so the management fee in the unit price analysis is mainly based on 8% of direct fee, partly with 4% of direct fee, and profits is based on 7% of direct fee, considering an actual ability, partly with 5% of direct fee. The technique part is construction organization design, adopting a more mature construction technique and construction experience, in which the work period is tight and reasonable, and labor force arrangement adequacy.
This text includes following contents:
1.Tender letter of the tender documents, include: Legal Representative's identity certificate; Tender document signed authorization orders; Tender letter; Tender letter appendix; Tender guarantee bank guarantees.
2.The business part of the tender documents, include: Elucidation of tender quotations; Summary form of tender quotations; The main material list tender quotations form; Sub-component projects in the list Quotation form; The measure item tender quotations form; Sub-component projects list item unit price analysis form.
3.The technique part of the tender documents, mainly is the construction organization design.
4.The attached figure part of the tender document, including to attached figure 1 with attached figure 2.
5.Engineering quantity calculation works part.
Keywords: tender letter; engineering quantity; bill of quantity tender quotations; unit price analysis; construction program