摘要
本设计首先根据原始资料得到设计的基本数据以及资料,在根据资料进行调洪计算得到调洪结果。利用调洪结果开始坝体的主体设计,例如非溢流坝段尺寸设计,溢流坝的设计等等。之后对主体设计结果进行验算。验算设计是否满足要求。主要满足要求是稳定要求以及应力要求。并且对一些细部结果进行设计,满足功能要求。最后为了使工程能够有序安全的完成,对整体进行施工组织设计。
关键词:设计 调洪 验算 满足要求
Abstract
The first design according to the original data to obtain the basic data design and the data, the data were calculated according to the flood control and floodresults. The flood dam body results began to design, such as the size of non overflow dam design, dam design etc.. After checking the main design results.Check whether meet the design requirements. Mainly to meet the requirements ofstability and stress. And carries on the design to the detail results, to meet the functional requirements. Finally, in order to make theordered and safe completion, the construction organization design to the overall.
Key Words:
目录
摘要 I
Abstract II
第一章 原始资料 1
1.1 流域水文概况 1
1.2洪水 2
1.3工程地质条件 5
1.3.1 区域地质概况 5
1.3.2库区工程地质条件 6
1.3.3坝址区工程地质 7
(1)地形地貌 7
(2)地层岩性 8
(3)地质构造 8
(4)水文地质条件 9
(5)物理地质现象 9
1.4 天然建筑材料 10
第二章 调洪计算 11
2.1底孔规模及死库容确定 11
2.2调洪演算 13
2.2.1堰顶高程与泄流方案 13
2.2.2计算下泄流量 13
2.2.3半图解法调洪演算 13
2.2.4调洪计算结果 14
第三章 非溢流坝段设计 15
3.1非溢流坝段剖面尺寸拟定 15
3.1.1 坝顶高程的拟定 15
3.1.2坝顶宽度 16
3.1.3 非溢流坝剖面尺寸 17
第四章 稳定分析 18
4.1稳定分析 18
4.1.1滑动面的选择 18
4.1.2对坝基面进行抗滑稳定计算 18
第五章 应力分析 20
5.1应力分析原理 20
5.2应力计算 20
第六章 溢流坝设计 22
6.1堰顶曲线 22
第七章 溢流坝挑流消能 24
第八章 枢纽布置 25
8.1坝轴线、坝型选择 25
8.2枢纽布置 25
8.2.1布置原则 25
8.2.2枢纽的总体布置 26
8.2.3布置方案 26
第九章 构造设计 27
9.1坝顶设计 27
9.2廊道系统 27
9.3坝体分缝 28
9.4坝体排水及闸墩 29
9.4.1坝体排水 29
8.4.2闸墩 29
9.5基础处理 29
9.5.1坝基开挖和清理 29
9.5.2固结灌浆 30
9.5.3帷幕灌浆 30