摘 要
道路工程工程量复核计算任务:根据图纸,计算相应工程数量,并编制计算书及工程量数量表。撰写毕业设计说明书,详细说明毕业设计思路,道路工程数量复核方法及过程,要求格式规范,计算准确,内容合理齐全,条理清晰。
本次工程设计是棋盘洲阳新至大冶公路2标段 (K25+350-K38+399.424),按设计速度80km/h的双向四车道高速公路标准设计,主线整体式路基宽度26m,路基横断面布置:行车道宽2×(2×3.75m),中间带宽3.0m(0.5m×2路缘带+2.0m中央分隔带),硬路肩宽2.5m×2(含右侧路缘带0.5m×2),土路肩宽0.75m×2 ;路面横坡:行车道、硬路肩为2%,土路肩为4%。中央分隔带为平齐式;路基设计标高为中央分隔带外侧边缘处路面标高。
关键词:高速公路;工程量;计算;复核;
Abstract
The road engineering quantity review calculation task: according to the drawing, calculates the corresponding engineering quantity, and compiles the calculation book and the engineering quantity quantity table. Write graduation design instructions, detailed description of graduation design ideas, road engineering quantity review method and process, required format specification, accurate calculation, reasonable and complete content, organized and clear.
Design of this project is Qipan Chau Yangxin to Daye Highway Section 2(K25) 350- K38 The main line integral roadbed width 26 m, roadbed cross section arrangement: carriageway width 2×(2×3.75 m), middle bandwidth 3.0 m (0.5 m×2 kerbs 2.0 central separation zone), hard shoulder width 2.5 m×2(including right kerbs 0.5), earth shoulder width 0.75 m×2; Cross-slope road :2% for carriageway ,4% for hard shoulder and 4% for earth shoulder. Central Government The design elevation of the roadbed is the pavement elevation at the outer edge of the central separation zone.
Keywords: highway; engineering quantity; calculation; review;
目 录
摘 要 I
Abstract II
一、总说明书 1
(一)设计标准 1
(1)路线方案的确定见地形图平面图 1
(2)路线起点、中间控制点及里程 1
(3)沿线自然地理概况 1
(4)技术标准与技术指标的的总体适用情况 1
(二)路线 2
(三)路基路面及排水 2
(1)路基排水 2
(2)路基工程 3
(3)路面工程 4
(4)桥梁及涵洞 4
二、路线说明书 6
(一)平曲线设计 6
(二)纵断面设计 6
(三)桥梁与涵洞 6
三、路面说明书 8
(一)设计原则和要求 8
(1)设计原则及依据 8
(2)设计的基本要求 8
(三)水泥混凝土路面 9
(四)路面板块设计 9
(五)路面结构方案的比选 10
(1)总体比选 10
(2)细节比选 11
(3)经济比较 11
(4)比选结论 12
四、路基说明书 14
(一)路基横断面布置 14
(二)路基设计 14
(1)设计的原则和要求 14
(2)填方路基设计 15
(3)挖方路基 15
(4)半填半挖路基 16
(5)路基附属设施 16
(三)路基压实标准与压实度 16
(四)路基防护 17
(五)路基路面排水 18
(六)边坡稳定性 19
(七)支挡工程 20
(八)施工注意事项 20
五、主要经济技术指标表 22